Integrated Transit Corridor Project: Six-lane Pragati Maidan tunnel opened from today, PM Modi inaugurated tunnel and underpass

  • Hindi news
  • National
  • Pragati Maidan Six Lane Tunnel from today, PM Modi inaugurated tunnel and underpass

New Delhi13 minutes ago

  • copy link
The construction cost of the Integrated Transit Corridor project is Rs 920 crore.  - Dainik Bhaskar

The construction cost of the Integrated Transit Corridor project is Rs 920 crore.

Prime Minister Narendra Modi on Sunday dedicated five underpasses, including the main tunnel of the Pragati Maidan Integrated Transit Corridor project, to the nation. This Integrated Transit Corridor is an integral part of the Pragati Maidan redevelopment project. The construction cost of the Pragati Maidan Integrated Transit Corridor project, fully funded by the central government, is Rs 920 crore.

It was not easy to prepare this corridor in such a short time. The roads around which this corridor is built are the busiest roads of Delhi. Corona came in the midst of all these difficulties. But, this is new India. He also solves problems, takes new resolutions and also makes efforts to fulfill those resolutions.

Those who knock on the door of Judiciary are no less
‘Today Delhi has received a very beautiful gift of modern infrastructure from the Central Government.’ However, he said in a sarcastic tone that ‘if you do such things, there are no less people knocking on the doors of the Judiciary.’ The PM said that ‘decades ago, Pragati Maidan was built to showcase India’s progress, the potential of Indians, India’s products, our culture. Since then India has changed, India’s capability has changed, needs have increased manifold, but Pragati Maidan has not progressed much.

Drivers will be able to reach their destination without jam.

Drivers will be able to reach their destination without jam.

Half an hour journey will be completed in five minutes
With the opening of this tunnel, the way of people going to India Gate via Meerut Expressway will become easier. With the opening of the six-lane Pragati Maidan tunnel, the movement of Ring Road and India Gate will be signal free. This part of the journey will be completed in barely five minutes instead of thirty minutes. This will facilitate the movement of all the roads near Pragati Maidan. Lakhs of drivers passing through these roads will be able to reach their destination without jam.

Along with East Delhi, people of Ghaziabad and Noida will also get the benefit of this.

Along with East Delhi, people of Ghaziabad and Noida will also get the benefit of this.

People of Ghaziabad and Noida will also get benefit
About 1.6 km long tunnel starting from Pragati Power Station on Ring Road will reach near National Sports Club. Along with East Delhi, people of Ghaziabad and Noida will also get the benefit of this. He will be able to reach his destination without getting stuck in the jam of Bhairon Marg and Mathura Road. At the same time, the movement of Mathura Road will also be easy. Due to the removal of four signals between DPS Mathura Road to Bhagwan Das T Point, reaching ITO Chowk will also be possible in minutes.

There is more news…